Educational

Mission Branch Library

Posted on

Mission Branch Library, Santa Clara Addition and remodel of an existing single story public library and adjacent site amenities. Project scope includes, but is not limited to, addition of four study rooms; construction of a new entrance to the community room and new outdoor paved areas; upgrade all existing glazing to energy-efficient insulated glazing; installation […]

Educational

Redwood High School

Posted on

Redwood High School New Multi-Purpose & Classrooms, Redwood City Construction consists of building and constructing a new multi-purpose building which includes a culinary arts classroom, student union and warming kitchen. Construct a new two-story classroom building to include an administrative space. Also, site lighting, landscape, hardscape & restore parking lot areas. Telescopic Bleacher System as well. […]

Educational

Mission College MT Replacement Building

Posted on

Mission College Replacement Building, Santa Clara New 2-story, 38500 SF steel and metal frame facility consisting of classrooms, labs, offices, and public space. Included new fire sprinkler, plumbing, HVAC, and electrical systems. Exterior consisted of air barrier, curtainwall, clear wall, storefront, plaster, insulated metal panel systems, and terra cotta shade structures. Interior finishes included sheet […]

Educational

Redwood High School New Multi Purpose & Classrooms

Posted on

(Photographs by Raidy Stronck) Redwood High School New Multipurpose & Classrooms, Redwood City The construction consists of building and constructing a new multi-purpose building which includes a culinary arts classroom, student union and warming kitchen. Construct a new two story classroom building to include administrative spaces. Also, site lighting, landscape, hardscape & restore parking lot […]

Educational

St. Catherine of Siena New Gym & Parish Center

Posted on

(Photographs by Raidy Stronck) St. Catherine of Siena New Gymnasium & Parish Center, Burlingame Completed on 11/24/2014 This job consisted of the construction of a new gymnasium & Parish Center building complete with HVAC, plumbing, electrical, fire protection, fixtures & equipment. Additional features include a stage, elevator, upstairs offices and conference room, and a large […]

Educational

West Valley College Applied Arts & Sciences Renovation

Posted on

West Valley College Applied Arts & Sciences Building Renovation, Saratoga Completed on 4/20/2016 Renovation of an existing concrete structural frame building with a concrete structural waffle slab deck system. The building is a one story structure that consists of 3 different floor finish levels that step 5-feet each. Improvements include: seismic upgrades, new interior partition […]

Educational

New Gymnasium at Egan Intermediate School

Posted on

New Gymnasium at Egan Intermediate School, Los Altos Completed on 6/1/2003 New 10,000 square foot gymnasium with collapsible bleachers, six retractable basketball hoops and aluminum-framed skylights. Project included GFRC panels and extensive site work including landscaping, turf block, and replacement of granite running track.

Educational

Woodside High School Library & Administration Building

Posted on

Woodside High School Library & Administration Building, Woodside Completed on 5/1/2001 New 20,000 square foot two-story library and administration building. The structure is a composite of structural steel, wood and metal framing with a plaster and stone veneer. The project also included extensive site work of a new campus plaza, ramps, walls, ADA upgrades and all […]

Educational

Jefferson High School

Posted on

Jefferson High School, Daly City Completed on 8/24/2004 Gonsalves & Stronck acted as the CM-at-risk for multiple modernization and new construction projects on a five-acre site at Jefferson High School in Daly City. Three projects ran concurrently over the summer months and included bridge repair with structural and seismic upgrades, renovation of a kitchen cafeteria, […]