Municipal

Peninsula Tennis Club

Posted on

Peninsula Tennis Club, Burlingame Modernization to the existing Peninsula Tennis Club in Burlingame. Work included bathroom ADA upgrades, new tennis court overlay, demolition of 2 existing swimming pools and spa making way for a new 2000 square foot, 71,000 gallon pool and 12′ round spa. New concrete pool decking, planters, landscaping and lighting were also […]

Essential Services

San Mateo Fire Station No. 23

Posted on

San Mateo Fire Station No. 23, San Mateo New construction of a two-story, 9,800 square foot fire station for the City of San Mateo. The project included th ree apparatus bays, work spaces, conference area, lobby space and public restroom on the first level and living space on the second level. Work also included new […]

Educational

Hillsdale High School Cafeteria, Arts & Media Center

Posted on

Hillsdale High School Cafeteria, Arts & Media Center, San Mateo Modernization of Buildings 2 and 3 on the Hillsdale High School campus. Improvements to Building 2 include approx. 17,650 SF and houses the cafeteria and food service functions, dance and student government classrooms and the existing theater. Improvements to Building 3 include approx. 15,800 SF […]

Educational

West Valley College Language Arts and Social Sciences

Posted on

  Pictures courtesy of HMC Architects West Valley College Language Arts and Social Sciences, Saratoga Phased modernization for the Language Arts and Social Sciences Department on the West Valley College campus. Work also consists of all new underground utilities as well as mechanical, electrical, security and audio visual upgrades. This project is received LEED Silver […]

Municipal

Berkeley Public Library South Branch Improvement Project

Posted on

Berkeley Public Library South Branch Improvement Project, Berkeley Demolish existing 5,400 sq. ft. library building and construct a new 8,656 sq. ft. single-story wood-framed library with wood/metal/tile exterior. Mechanical systems include radiant floor heating and forced-air cooling. Electrical systems include design/build Photovoltaic system. Site work includes underground, site concrete and landscaping. This project received LEED […]

Aquatic

Independence High School Pool Renovation

Posted on

Independence High School Pool Renovation, San Jose Renovation two (2) swimming pools (Diving & Competition). Work includes demolition and construction, re-piping, refurnishing, new plaster and tile, new concrete decks,walkways and deck drainage system, new drainage system, new surge tanks, new circulation system, new filtration system, new finish work for interior swimming pools- Separation of two […]

Aquatic

Santa Clara Senior Center Expansion

Posted on

Santa Clara Senior Center Expansion, Santa Clara This expansion project removed and renovated portions of the existing senior center facility and added over 44,000 new square feet of usable space including a new aquatics wing- making the Santa Clara Senior Center the largest in the Bay Area. The existing reception area was remodeled and the […]

Educational

Merrill College, UC Santa Cruz (Phase II and III)

Posted on

Merrill College, UC Santa Cruz (Phase II and III) A Phase II-Completion of the Plaza Building shell and interior constructed in Phase I, upgrades to existing Gatehouse Building mailroom, breezeway opening & washrooms, and lastly site work which included site retaining walls, walkways, entry bridges to the Dormitory buildings, landscaping and site improvements.Phase III-Construction consisted of […]