Aquatic

New Giammona Pool at Westmoor High School

Posted on

Giammona Pool at Westmoor High School, Daly City Completed on 10/2/2010 New concrete and masonry block structure housing a new pool facility with bleacher seating and locker rooms complete with mechanical, plumbing and electrical systems. Work on the four-acre site included demo of existing pool, site work including new basketball courts, parking lot and landscaping […]

Essential Services

Mountain View Fire Station No.2

Posted on

Mountain View Fire Station No.2, Mountain View Completed on 3/2/2002 Demolition of existing fire station and the construction of a new 6,000 square foot station for the City of Mountain View. The building structure included masonry, metal stud framing, structural steel framing and trusses, and wood trusses with an exterior skin of masonry veneer, cement […]

Lab

UCSF Koret Vision Research Laboratory

Posted on

UCSF Koret Vision Research Laboratory, San Francisco Completed on 3/1/2002 Complete renovation of a third floor ophthalmology laboratory at UCSF’s Koret Vision Center where research is conducted on the visual cortex of humans and monkeys to determine how visual perception occurs in the brain. The lab contains cage wash equipment, surgery areas, a computer analysis […]

Essential Services

San Mateo Fire Station No. 26

Posted on

San Mateo Fire Station No. 26, San Mateo Completed on 2/8/2003 New, two-story 5,881 square foot fire station facility in San Mateo’s Lakeshore Park containing administration offices, dormitory-style sleeping rooms, a weight room, and a steel-framed bay housing two engines, a medical clean-up room and an equipment storage and repair area. Due to the project’s […]

Municipal

I.B.E.W. Electrical Training Center

Posted on

I.B.E.W. Electrical Training Center, San Carlos Complete Pre-construction and GC services performed on the new 15,000 square foot two-story structural steel training center project for San Mateo County’s Electrical Union. The facility contains classrooms, computer labs, conference rooms, administration offices and warehouse space. The project also included demolition of the existing building including asbestos abatement […]

Educational

San Jose City College Student Services & Career Center

Posted on

San Jose City College Student Services & Career Center, San Jose Two-story, structural steel Student Services & Career Center Facility at San Jose City College. Work included new building construction, site utilities, paving, landscape development, and other site improvements. The 70,000 square foot building houses the campus bookstore, an enclosed loading dock, 20,000 square feet […]

Aquatic

City of Morgan Hill Aquatics Complex

Posted on

City of Morgan Hill Aquatics Complex, Morgan Hill New 5-acre, LEED-silver certified, aquatics complex consisting of a 50-meter competition pool, instructional pool, recreational pool and splash play area for tots. The complex also features group picnic areas, shade structures, and a 30-foot windscreen designed to protect against the prevailing north-south valley winds which minimizes evaporation […]

Municipal

Millbrae Library

Posted on

Millbrae Library, Millbrae New state-of-the-art 26,000 square foot steel frame library which replaced the existing public library at the Civic Center area. Project included site clearance and redevelopment including a new parking lot, driveways, sidewalks, a public square and landscaping all part of the newly designed civic plaza.

Lab

UCSF 14th Floor Pediatrics Lab Renovation

Posted on

UCSF HSE 14th Floor S/M Pediatrics Lab Renovation, San Francisco Renovation to approximately 12,000 square feet of the entire 14th floor in the HSE building for an open-space designed Pediatrics research laboratory containing work benches for approximately 110 stations, laboratory support, conference/library space, break room, study carrells, administrative offices, glass wash/autoclave area and equipment storage […]